DCS Room with Synchronisation panel

Ensuring Maximum Plant Availability

ENMAS EPC’s operations and maintenance team is key role is to ensure maximum avialbility by performing feedstock maintenance, spare parts inventory, preventive maintenance and scheduled outage preventive studies.

How can we help you?

EEPC has designed and engineered over 80+ plants, reach out to us for your energy needs.

ENMAS EPC's O&M

Feedstock Maintenance

Inventory Management for Spares

Preventive Maintenance

Scheduled Outage Preventive Studies